<sup id="eeeee"></sup>
  • <nav id="eeeee"><sup id="eeeee"></sup></nav>
    
    
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <noscript id="eeeee"><dd id="eeeee"></dd></noscript>
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <tfoot id="eeeee"><noscript id="eeeee"></noscript></tfoot>
    无码AV免费毛片一区二区,www.色网,99久久精品国产精品亚洲,狠狠色丁香婷婷久久综合2021,免费人成在线观看VR网站,一区二区视频午夜福利,五月天乱伦小说,999久久精品国产

    How to use electric sintering furnace correctly?

    2021-11-29 1597

      1: Check whether the circuit and water circuit of sintering furnace are normal, such as normal power on and water supply.

      2: Open the mechanical pump, slowly open the pre pumping valve after 30 seconds, and open the front stage valve after 1 minute.

      3: When the vacuum degree reaches below 10Pa, turn over the lax pump and heat the lax pump

      4: After the lax pump is heated to 60 minutes, close the pre pumping valve and open the high vacuum valve, and the vacuum will gradually reach the high vacuum.

      5: For heating initiation, please select Manual heating below 200 degrees. In the manual operation menu of the control panel, pay attention to that when you use it once, the dial button is not firm up and down once, and then dial it to the manual position to initiate heating. Enter about 50. Automatic heating when the current is normally controlled below 300A: set the temperature control meter in the temperature control interface to automatically start heating or open the manual position to start heating manually. The above setting clarifies that it takes 120 minutes from 200 degrees to 600 degrees, 30 minutes from 600 degrees, 130 minutes from 600 degrees to 1000 degrees, 5 hours at 1000 degrees, 60 minutes from 1000 degrees to 600 degrees, and the program will continue automatically after 60 minutes (Note: Set - 121 in time, and the program will continue automatically here). After setting the heating process, first heat continuously manually, then turn the dial button to the automatic position to initiate the automatic heating program. If the data needs to be recorded, please mark "√" at the data storage meeting.

      6: In the heat preservation state, the normal circulation of circulating water shall be adhered to.

      7: When the holding time is up, turn off the heating switch. Assuming that high vacuum is not required, close the slack pump, open the pre pumping valve, close the high vacuum valve and start cooling. Caution: do not turn off the mechanical pump

      8: When the temperature drops to 200 ℃, turn off the mechanical pump (the lax pump reaches the normal temperature) and close all valves.

      9: Release the pressure at room temperature, rush in the air and take out the raw materials.

      10: If the operation is not continued, open the mechanical pump and pre pumping valve, vacuum for another 5 minutes, and close the mechanical pump and pre pumping valve. Adhere to the vacuum degree in the operation room to avoid water vapor intrusion.

      11. Pressure operation: first, in the manual operation interface, the pressure reporting form is set to the automatic position, which can be operated directly with the instrument. After setting the program, press the run key for 3 seconds, and press the stop key for 3 seconds.

      Article from:http://www.oavoav.cn

    主站蜘蛛池模板: 中文字幕人妻无码专区APP| 日本一区精品久久久久影院| 中文字幕一区二区三区精品| 久爱午夜精品免费视频| 毛片传媒| 极品国产主播粉嫩在线观看| 欧美日韩区1区2区3区| 色爱无码AV综合区老司机非洲| 产精品无码一区二区三区免费 | 久久婷婷五月综合色精品首页| 久久久日韩精品一区二区三区| 亚洲AV不卡一区二区三区| 俄罗斯少妇性XXXX另类| 国产喷水1区2区3区咪咪爱AV| 日本熟妇一区二区三区| 欧美日韩国产一区二区三区播放| 国产日本亚洲一区二区| 久久99爱国产精品| 天堂av在线播放免费| 日本黄色三级片网站| 日韩精品成人网页视频在线| 欧美乱子伦xxxx12| 国产开裆丝袜高跟在线观看| 欧美精品亚洲精品日韩专区va| 国产午夜无码片免费| 中文字幕av国产精品| 天天躁日日躁狠狠躁一区 | AV不卡国产在线观看| 成人久久精品一区二区三区| 人妻精品无码一区二区三区| 女人18毛片水真多免费视频| 日韩中文网| 泸西县| 国产精品资源手机在线播放| 成人免费乱码大片a毛片| 99婷婷久久精品国产一区二区| 午夜福利无遮挡十八禁视频| 欧美成人免费看片一区| 一区二区三区鲁丝不卡| 久久久亚洲精品一区二区三区| 高潮一区二区三区av|