<sup id="eeeee"></sup>
  • <nav id="eeeee"><sup id="eeeee"></sup></nav>
    
    
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <noscript id="eeeee"><dd id="eeeee"></dd></noscript>
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <tfoot id="eeeee"><noscript id="eeeee"></noscript></tfoot>
    无码AV免费毛片一区二区,www.色网,99久久精品国产精品亚洲,狠狠色丁香婷婷久久综合2021,免费人成在线观看VR网站,一区二区视频午夜福利,五月天乱伦小说,999久久精品国产

    How to use electric sintering furnace correctly?

    2021-11-29 1718

      1: Check whether the circuit and water circuit of sintering furnace are normal, such as normal power on and water supply.

      2: Open the mechanical pump, slowly open the pre pumping valve after 30 seconds, and open the front stage valve after 1 minute.

      3: When the vacuum degree reaches below 10Pa, turn over the lax pump and heat the lax pump

      4: After the lax pump is heated to 60 minutes, close the pre pumping valve and open the high vacuum valve, and the vacuum will gradually reach the high vacuum.

      5: For heating initiation, please select Manual heating below 200 degrees. In the manual operation menu of the control panel, pay attention to that when you use it once, the dial button is not firm up and down once, and then dial it to the manual position to initiate heating. Enter about 50. Automatic heating when the current is normally controlled below 300A: set the temperature control meter in the temperature control interface to automatically start heating or open the manual position to start heating manually. The above setting clarifies that it takes 120 minutes from 200 degrees to 600 degrees, 30 minutes from 600 degrees, 130 minutes from 600 degrees to 1000 degrees, 5 hours at 1000 degrees, 60 minutes from 1000 degrees to 600 degrees, and the program will continue automatically after 60 minutes (Note: Set - 121 in time, and the program will continue automatically here). After setting the heating process, first heat continuously manually, then turn the dial button to the automatic position to initiate the automatic heating program. If the data needs to be recorded, please mark "√" at the data storage meeting.

      6: In the heat preservation state, the normal circulation of circulating water shall be adhered to.

      7: When the holding time is up, turn off the heating switch. Assuming that high vacuum is not required, close the slack pump, open the pre pumping valve, close the high vacuum valve and start cooling. Caution: do not turn off the mechanical pump

      8: When the temperature drops to 200 ℃, turn off the mechanical pump (the lax pump reaches the normal temperature) and close all valves.

      9: Release the pressure at room temperature, rush in the air and take out the raw materials.

      10: If the operation is not continued, open the mechanical pump and pre pumping valve, vacuum for another 5 minutes, and close the mechanical pump and pre pumping valve. Adhere to the vacuum degree in the operation room to avoid water vapor intrusion.

      11. Pressure operation: first, in the manual operation interface, the pressure reporting form is set to the automatic position, which can be operated directly with the instrument. After setting the program, press the run key for 3 seconds, and press the stop key for 3 seconds.

      Article from:http://www.oavoav.cn

    主站蜘蛛池模板: 亚洲AV永久天码精品天堂DL| 在线观看国产精美视频| 精品福利一区二区在线观看| 亚洲免费国产午夜视频| 亚洲欧美日本国产专区一区| 久久最新网址| 人人妻人人爽人人狠狠| 福利导航大全| 亚洲狠狠婷婷综合久久久久图片 | 夜夜高潮夜夜爽高清视频| 欧美大屁股XXXX高跟欧美黑人| 丰满人妻熟妇乱又伦精品劲| 国产免费一级高清淫日本片| 成人免费小电影| 无码中文字幕精品推荐| 中文字幕免费无码专区剧情| 国产精品免费久久久久影院小说| 亚洲一本二区偷拍精品| 中文字幕在线视频不卡 | 99精品全国免费观看视频| 精品人妻视频在线免费| 亚洲国产系列一区二区三区| 成人无码一区二区三区网站| 久久99国产伦精品免费| 嵩明县| 国产激情一区二区视频桃花视频| 久久久久久九九99精品| 亚洲国产成人久久一区久久| 天天摸夜夜摸夜夜狠狠添| 人妻交换中文字幕av| 福利姬在线看| 国产综合色产在线视频欧美| 中文字幕麻豆一区二区| 和林格尔县| 亚洲最大成人网 色香蕉| 亚洲国产精华液网站w| www中文字幕在线观看| 免费大黄网站在线观| 欧美日韩在线一区二区| 无码人妻AⅤ一区二区三区水密桃 亚洲AV无码一区二区一二区教师 狼友视频网站 | 色欲综合久久中文字幕网|